Answer / venkat
fe stands for ferrous.415 stands for tensile strength
subjected to elongation
| Is This Answer Correct ? | 26 Yes | 3 No |
Answer / arjun kumar
fe stands for ferrous and 415 is the characteristic
strength of steel in N/mm2 or yield stress of steel
| Is This Answer Correct ? | 21 Yes | 0 No |
Answer / ratheesh
Fe = Ferrous iron
415 = characteristic srength N/mm2
| Is This Answer Correct ? | 14 Yes | 1 No |
Fe means Furious Iron
& 415 is Tensile strength of steel i.e 415 N/mm^2
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / venkatakrishna
Fe -థStands గIron
and 415- stands
characteristic
strength units -N/
ఠmm2 నఅప
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / d vishwanath s
Fe - ferrouse iron
415- chacteristics strenth of steel or yeild stress of steel
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / bhosalepravin20
fe - symbol used for iron . &
415- yield strength in MPa.
| Is This Answer Correct ? | 3 Yes | 4 No |
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
What is the cement and sand content in the mortar used to build 1 sqm of 190x190x390mm hollow and solid blockworks?
please differentiate duties and responsible for civil site engineer , Quantity suryevor ,Quality control engineer and Planning engineer
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
0 Answers Gammon, Rajiv Gandhi University of Knowledge Technologies RGUKT,
How much steel required in one cubic meter RCC Main girder
How many feet are in 4 square yards?
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
logical reasoning
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
how to calculate the 45 degree bent up length. if we given that whether the total length of the slab reinforcement will increase or not. mantion it clearly please. this is for bar bending schedule purpose?
what is the size of shuttering?????
4 Answers SKV Builders and Development Pvt Ltd,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)