How much does it cost for a R.C.C roof slab of size (25 X
20) given in feets using 1:2:4 concrete mix of M20?
Answers were Sorted based on User's Feedback
Answer / bong/mustafa
r.c.c roof slab given = 25*20,
25ft=m/3,28ft=7,62*6.097= 46.46 m2
vol = 9.28 = 10 bags =
= 20 cub =
= 40 cub =
Is This Answer Correct ? | 68 Yes | 27 No |
Answer / soumya
rate of M20 concrete per cum= Rs.2900
labour charge=250 rs
shuttering cost=300
total =2900+250+300=3450/cum
here area given as =25*0.3048*20*0.3048=46 sqm
assume roof thickness as 10 cm
there for Qty =46*0.10=4.6 cum
cost of rcc roof =4.6*3450=15870
Is This Answer Correct ? | 55 Yes | 29 No |
Answer / dharmaraja mk
Concrete slab area = 25' x 20'
= (25x.3048)x (20x.3048)
= 7.62 x 6.096
= 46.451 Sqm
The IS CODE is recommended the minimum roof slab thickness is 125mm.
= 46.451 x .125
= 5.806 CUM
The RMC rate approximate 3000/cum.
Labour Mason-3no, mc-4no
= (3x500)+(4x350)
= 2900
Concrete coste = (5.806x3000) + 2900
RS = 20319
If it is not calculate for Shuttering cost.
Is This Answer Correct ? | 37 Yes | 15 No |
Answer / muzaffar hussain
roof concrete size width 40 feet length 53 feet(plz send me estimate stone quantity & size sand cement and labor charges
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / lalit kumar sharma
i want to do a rcc slab 19*19 how much total all cost, iron, sand, dust rodi, cement
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / kage
All given answers are thumb rules . No body has calculated from basics. This is the reason they are converting the sizes in to metric. because the thumb rules available with them are in metric sizes.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / gokul
I want build water tank in rcc, size L-20ft x B-17ft x H-12ft. Wall thickness 0.75ft. Please give construction price.
Is This Answer Correct ? | 0 Yes | 0 No |
silt%= silt volume/ silt+sand volume is this right?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
why we are useing plastic under the lean concrete?and whts the advantage?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
0 Answers First American Corporation, GS Infra, L&T, Real Sociedad,
what isload waring calculation
what"s the responsibilities for QC(quality controler)in high rise buildings?
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
what is a steel formula
What is the density of pcc considered in structure design for load calculation
how to calulate coping material of boundry brick wall
Lap length may different for FE 415 and FE 500 Steel, If different what is the different, In which code is mentioned
Hi all, need Staad Pro V8i tutorial