How much does it cost for a R.C.C roof slab of size (25 X
20) given in feets using 1:2:4 concrete mix of M20?
Answer Posted / dharmaraja mk
Concrete slab area = 25' x 20'
= (25x.3048)x (20x.3048)
= 7.62 x 6.096
= 46.451 Sqm
The IS CODE is recommended the minimum roof slab thickness is 125mm.
= 46.451 x .125
= 5.806 CUM
The RMC rate approximate 3000/cum.
Labour Mason-3no, mc-4no
= (3x500)+(4x350)
= 2900
Concrete coste = (5.806x3000) + 2900
RS = 20319
If it is not calculate for Shuttering cost.
| Is This Answer Correct ? | 37 Yes | 15 No |
Post New Answer View All Answers
Minimum and maximum size of the building components
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
What is bylayer?
Define What is aggregate?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
The mixture of different ingredients of cement is burnt at?
What do you mean by bond? What are the different types of bonds?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is hydrostatic paradox?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Which type of plywood & sizes using in construction projects ?
what is the function of GSB all class ?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
How to make tiles floor step by step procedure?
If specific gravity of cement is less than 3.15 what is the cause?