Steel requirement in kg of 6" thk slab Total qty 32.64 m3
Beam / column qty 35.39 m3
No Answer is Posted For this Question
Be the First to Post Answer
what is th consuption of cement , sand in plastering for 15mm thick cm1:4,1:3
how can change 12mmdia@150c/c bar spacing to 16mmdia
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
0 Answers HR Construction, JP Group,
What is the method of soil replacement test?
what is diffreant between the english bond&flamish bond
how to calculate the lap bar for bor culvert ?
What is m20 and What is 20 ?
2 Answers Sukhwani Constructions,
how many litr. of paint will required for 1 sqm area of wall(internal wall and external wall) ??
what is right time of slab DE shattering and beam boo tam.
What is the difference between Hinged and pinned in Column ends