what is the real de-shuttering time for rcc column,slaband
wall
Answers were Sorted based on User's Feedback
Answer / shishir bhansali
rcc column 12 hours
rcc slab depending upon the span. from 5 days to 14 days
rcc wall 12 hours
Is This Answer Correct ? | 29 Yes | 3 No |
Answer / ravi kant sharma
Minimum 16 to 18hr for column for any grade of r.c.c.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / royalcivil
the de-shuttering time for the slab is 21 days must.
for the column it should be minimum of 1 week
Is This Answer Correct ? | 10 Yes | 26 No |
How to calculate the volume of sloped isolated footing?
what is the requierd compressive strenth for m 20 grade concreat for 7 days?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
Please explain soil invistigation methods?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
what course did you consider thinking before you enrolled in college?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
How to rectify thermal cracks (2mm wide, 9mm deep aprx. ) developed in tremix finished concrete floor?
How to Calculate the amount of Cement mortor required only for 12 or 10 mm bonding? I mean to know only the amount of mortar for bonding not for plastering. Help me to find this.
where the corner reinforcement be placed in the rigid road pavement? can it be placed below the bottom main bar of double netting pavement?
What is meant by autocad?
How do you calculate reinforcement weight of steel?