How much does it cost for a R.C.C roof slab of size (25 X
20) given in feets using 1:2:4 concrete mix of M20?

Answer Posted / kage

All given answers are thumb rules . No body has calculated from basics. This is the reason they are converting the sizes in to metric. because the thumb rules available with them are in metric sizes.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the effect of duration of earth quake on framed structures ?

1805


why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?

2585


as per is code, what is the minimum content of opc and ppc cement for rcc structure

1739


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

4870


What is the l/d ratio of cantilever beam?

1442






What is the use of array command?

695


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2338


how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?

2000


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1734


What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????

2353


What is an ice dam sock?

703


how calculate the bearing from two coordinates?

1760


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

1303


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3538


Write short note on construction programme for pile foundation.

4968