Answer / thuranga
L-G fault is most common in distribution systems,as the
trees and buildings are near by the distribution lines,
while in transmission lines any of the fault can
occur....but occurrence of fault is very rare,as all the
protection steps are taken,and the fault may occur mostly on
the degradation of the suspended disc insulators.....where
the leakage current flows through the pole/tower to the
ground, through insulator.
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / banti rawat
Double line to ground fault is common fault in unsymmetrical fault
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / yonas brhanemeskel
The most common type of three phase in unsymmetrical fault
occurred in power system is single line to ground fault .
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate the minimum permissible limts of insulation resistance of switchyard equipments
HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.
what will happen if a part of primary winding of a transformer is accidentally short-circuited?
as we see that in our country the power rating for transmission is always rated in multiple of 11 like 11kv,33kv,66kv132kv. So i want to know wht is reason or logic here.
What is bridge rectifier and explain with details
what is package substation.how many types they have
What are the basic elements used for modeling mechanical rotational system?
In 11KV Double pole structure for each phase we are using Disc one Insulator. Why we are not using 2 r above insulators instead of one insulator?
1KVA transformer of different frequencies of 50hz,100hz,500hz&1000hz. which one of these transformer has big size? Give reason
16 Answers Ecil, Engineers India, MahaDiscom,
why Induction Generators are not "Black start" ? and apart from WTGs where this types of generator are generally used?
What is the count of hvdc transmission lines in india?
i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)