Answer / narendra deshmukh
In cut over activity of MM,
1.Upload the Material Master.
2.Upload the Vendor Master.
3.Upload the Excise Master.
4.Upload the Excise Register.
5.Upload the Open P.O.,Shed. Agreement,Contract,Invoice
Receipt.
Is This Answer Correct ? | 28 Yes | 0 No |
Answer / bala
Cut Over Process:
When we go for cut over, first of all we need to make sure
that all configuration are in place in production that is
thru the TR's which we have created...
Second, We have to do the manual configuration in
production before we go for cutover.
Third we have to move all the master data and transactional
data to production. Make sure that the sequence of the load
should be in proper. Otherwise it will be big problem while
loading...
Is This Answer Correct ? | 23 Yes | 1 No |
Answer / shuvankar
Detailed plans need to be developed for cutting over from
the old system(s) to the new. Parallel runs of what will
happen over the conversion period using test data, convert
and watch for a period after wards to ensure nothing
unexpected happens.
Is This Answer Correct ? | 13 Yes | 3 No |
Answer / sunil
For cutover In MM, Open PO, Sch.Agre.,Contract, and invoice
receipt.
Is This Answer Correct ? | 7 Yes | 3 No |
What is difference between stock transfer & transfer posting?
What is the use of ‘split valuation’?
how many levels in sap ?what are they?
Where the schedule margin key is customized?
How Return delivery process is working? How to post the qty & with which movement type?
What are the types of special stocks available?
4 Answers Automatic Infotech, Havells, Patni, Yash Technologies,
What are the steps required for integration between MM and SD?
Mention the document types that are used in purchase requisition?
What are various procedures for counting physical inventory?
In material master do you know any basic tables? What is the difference between MARA and Mark?
Explain what is cbp?
what is ecc and ehp?