Answer Posted / shuvankar
Detailed plans need to be developed for cutting over from
the old system(s) to the new. Parallel runs of what will
happen over the conversion period using test data, convert
and watch for a period after wards to ensure nothing
unexpected happens.
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
Explain credit memo
Explain what is sap mm?
Difference between planned delivery time and gr processing time?
What is difference between gr blocked stock and blocked stock?
What is a profit center?
How is consignment material procured?
What is 'goods movement'?
What big changes does this upgrade bring?
How are batch numbers assigned?
How is the pricing of consignment stocks done?
Can we have release procedure without classification for a po?
Which documents are generated in migo 101 movement type? Which accounts are effected in the process?
What is a 'factory calendar'?
Why is the receipt of the goods imported to a company?
What are the terms planned delivery and gr processing time?