Answer Posted / girish rawat
THE LEAST COUNT OF THE LEVELLING STAFF WAS 5MM EARLIER.
NOWADAYS YOU GET LEVELLING STAFF WHICH HAS 1MM ACCURACY ON
THE REAR SIDE. CHECK IT OUT
Is This Answer Correct ? | 38 Yes | 7 No |
Post New Answer View All Answers
silt%= silt volume/ silt+sand volume is this right?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
Can we use the flyash bricks in brick bat coba?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
residential buildings,mixing of concrete,structural,construction material,site handling.
what is the coefficient for running feet to cft coversion both area and price
how to identify the failure of building by expansive soils
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
For the construction project what capital cost has to be taken in consideration?
Explain moment of inertia?
What is the difference between built area and super built up area?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
What is rate for brick masonry work of 1.0 m3 in cm 1:6?