Answer Posted / ashok
5mm
| Is This Answer Correct ? | 41 Yes | 1 No |
Post New Answer View All Answers
How is make concrete cube?
How to do rate analysis for concrete work including shuttering work?
what is the difference between natural draught cooling tower and induced draught cooling tower
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
Which Types Of Bricks ?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
TELL ME THE EQUATION FOR OGEE SPILLWAY
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how much repeitation for conventional and maivan formwork?
why are you joining in this (applied post) job and your aim for this job
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
Wat is meant by Aecron brick?