what is the least count of auto level staff
Answers were Sorted based on User's Feedback
Answer / engineer
Least count of automatic level is 0.001m or 0.01ft
| Is This Answer Correct ? | 2 Yes | 0 No |
what is the name of coarse sand which is used in making of concrete
How to calculate the wall thickness of building?
how many cubic feet in one unit of sand?
16 Answers L&T, PSPCL, Ratna Infrastructure Projects,
What is all weather canal
How much bricks, cement
in steel bar weight formula (d^2/162).so what is 162.
2. What are the grades of steel used in the concrete design?
Who name us Engineer & Why?
What is the cost difference between site mix and ready mix concrete per cubic meter
Why I-section is preferred to channel section?
what is mean by shear resistance in concrete?
3 Answers CCCL, Noble Consolidated Glazings, Sobha Developers,
8mm steel not available at site used bar 8mm and 150cc please tell me specing i used 10dia bar write formula please
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)