what is the least count of auto level staff

Answer Posted / raj kumar

what is the least count of Total Station

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.

1872


Are you ready to relocate with your immediate family to United States as a new employee?

4852


what isload waring calculation

1864


how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?

1949


How to plan a project

1683






yasser arfatcompleted his degree in civil from which university

1775


what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.

1831


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1858


how many BSCs can i connect to the HUAWEI MSC

1807


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

1607


What are the different types of civil engineering?

631


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

1998


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

1780


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

4529


cement and sand required for one block of size 0.23*0.15*0.46

1345