FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN
WHERE RUN OFF WILL BE HIGHEST?
Answers were Sorted based on User's Feedback
Answer / ruchi
runoff will be highest where the permeability of the soil
is minimum( coef of pearm. 'C' will be maximum).
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / aung
generally Q = C* I* A
Q= runoff
C= catchment factor
I= rainfall intensity
A= catchment area
| Is This Answer Correct ? | 1 Yes | 1 No |
While Calculating Quantity Of cement,sand,Metal we get cement in no of bags,Where Sand & Metal we get in Meter Cube(M3)how to convert it to Units(i.e in no of lorry's or Tractors )
how statics is different from dynamics
What is the standard volume of pharma in cub ft
0 Answers Deepa Constructions,
100 cubic meter of concrete will contain how much amount of cement, sand and aggregate to form a mix of M15
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
Please let me know the name of university which is offered distance education in BE or Btech in direct 3rd samester????
can any one explain bar bending schedule of bems and columns and slabs ??
what is the proportion of M200 &M300 grade concrete
1 Answers Karrm Infrastructure,
when we calculate concrete volume in footing the column along with footing up to the ground level is also taken or not ?
DESIGN OF TRUSS ELEMENTS
what is the least count of auto level staff
how many meters for brad gauge?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)