FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN
WHERE RUN OFF WILL BE HIGHEST?
Answers were Sorted based on User's Feedback
Answer / ruchi
runoff will be highest where the permeability of the soil
is minimum( coef of pearm. 'C' will be maximum).
| Is This Answer Correct ? | 12 Yes | 0 No |
Answer / aung
generally Q = C* I* A
Q= runoff
C= catchment factor
I= rainfall intensity
A= catchment area
| Is This Answer Correct ? | 1 Yes | 1 No |
Can a 9" x 24" RCC beam be supported on 18" x 18" RCC beam.
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
how many spacers we need for 1 ton reinforcement? aprox.
While calculating quantity of cement required for 1 qubic meter If mix is m25 1:1:2 =4 1.52/4=0.38, 0.38x1440=547.20 kgs I know 1440 is unit weight of cement And what is 1.52 ? And some one using 1.54 and 1.53 etc... Why they are using can u explain me what is 1.52, 1.53, 1.54?
how to calculate steel for slab or footings?
Which are the Steel tests ?
How to Determine the Quantity of Cement Sand , Aggregete and Reinforcement Bars in 30 feet X 40 Feet and Height is 4 Feet .
What is the Requirements of indoor & outdoor Substation Construction? What is the main Safty Requirements for SubStation Construction?
What are the skills required to become an architect?
what is the code for classification of bricks
how to calculate 162/D2 FOR TMT
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)