FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN
WHERE RUN OFF WILL BE HIGHEST?
Answer Posted / aung
generally Q = C* I* A
Q= runoff
C= catchment factor
I= rainfall intensity
A= catchment area
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is portland cement
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
in one SQM plaster how much Cement and sand consumed in ratio 1:4
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
what is the minimum compressive strength of clay brick
How to calculate plastering for elevated water storage tank
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
What is 1/8 on the architect ruler denotes?
Define What is aggregate?
insted of bentonite we can use any alternate material in piling ?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is rate of concrete surface rendering work per sqm
Sir how to find cutting length for footing steel bars in the shape of "u"