FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN
WHERE RUN OFF WILL BE HIGHEST?
Answer Posted / romy som
IN A FOREST AREA.
| Is This Answer Correct ? | 1 Yes | 7 No |
Post New Answer View All Answers
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
how to conversation of all construction material in to brass
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
List out some of the common problems that architect have to tackle it?
Explain what is 1/8 on the architect ruler denotes?
In which code the the maximum height of concrete casting has been explained
What is costing in 100squre feet bricks
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
Which code is used for tor & tmt steel bar?
Pls explain me about tension and compression in a flat slab
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how many shuttering material required for 1000 sq.m built up area.
"Gates of the dams are generally designed of curved shape". Why?