What is the Requirements of indoor & outdoor Substation
Construction?
What is the main Safty Requirements for SubStation
Construction?
10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
what are the types of dimensioning?
1 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
how to calclate the cemment for 1 cubic metre of 1:2:4 concrete
how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars
brickwork labour rate per cum ?
how bridge design is to be start? what is the preliminary step for design? which code of practice is to be used for design? what r the methods used for design? what r the ivestigation r carried out? what r the design criteria for design and loading conditions?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
Explain what is alternate bid?
how many bricks,cement,sand of a 40*30*6 ft bowndry wall?
6 Answers Natco, NGO, OGDCL, SIL, Simplex,
Define What is aggregate?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)