Answer / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / karthik rajendren
3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile
Is This Answer Correct ? | 3 Yes | 0 No |
can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz
Can i have pumpable mix design for M10 concrete without fly ash with OPC 43G cement?
Rectangular room is more effective than a square room because ––
what is the bar bending schdule
it is a corrected question." make a list of engineering property(properties) of soil.
0 Answers AAI Airports Authority Of India, DLF,
what is the m20 grade concrete ingredients?
how can we calculate cutting length of a column ring (300 x 600)
16 Answers AVL, Manchanda, Vardhman,
whate the size of bricks are avalable at site
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
What is the diffence between prescribed mix and design mix
the diff bet face left & face right observation of theodolite is 3' the error is 45'' 1'30'' 3' 0'
What are the methods to do a estimate.