what is lap length? why it is required? ..

Answer / priya

In the construction of RC buildings, due to the
limitations in available length of bars and due to
constraints in construction, there are numerous
occasions when column bars have to be joined. A
simple way of achieving this is by overlapping the two
bars over at least a minimum specified length, called
lap length. The lap length depends on types of
reinforcement and concrete. For ordinary situations, it
is about 50 times bar diameter. Further, IS:13920-1993
prescribes that the lap length be provided ONLY in the
middle half of column and not near its top or bottom

Is This Answer Correct ?    28 Yes 2 No

what is lap length? why it is required? ..

Answer / sjtbehera

Lap length are recquired when distance of structure is
larger than the length of Bars.
It is recquire to bind the two bars so that load can
carried.

Is This Answer Correct ?    6 Yes 4 No

what is lap length? why it is required? ..

Answer / deoghar

Lap length is required for tie up with same bar for continuity of the role or steel.

Lap length : 50d 

Is This Answer Correct ?    0 Yes 0 No

what is lap length? why it is required? ..

Answer / om prakash narayan

Lap Length is 3/2 lap Lenths. Depends on Road
Length.Methods are 3/2. ItS Reqiured is very impotant
Reniforcement continous.

Is This Answer Correct ?    2 Yes 9 No

Post New Answer

More Civil Engineering Interview Questions

How calculate the water for 1m3 concrete

6 Answers   DLF,


How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?

0 Answers  


cement quantity in 1 M3 pcc

2 Answers  


what is high type road and low type roads

0 Answers  


in m45 what does m and 45 refers

4 Answers  






Why we used ther red bricks for construction..

1 Answers   Lodha,


where we use one way slab and two way slab?

7 Answers   SRM,


What are the functions of a column in a building?

1 Answers  


briefly describe your ideal job?

1 Answers   Bahwan Engineering,


how can calculate cutting length of diamond ring

0 Answers  


We are working building soling work so soling thickness given 230mm but total are 50 cum. So I am purchased how meny tons is here spreading plz. Tell me

1 Answers   GKC Projects Limited GKCPL,


what are different grades of concrete and their classifications?

3 Answers   Collage, SP,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)