Answer Posted / deoghar
Lap length is required for tie up with same bar for continuity of the role or steel.
Lap length : 50d
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to calibrate the RM 800
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
What is an object snap mode?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
Form where IS456 is adopted in 1978?
a butt weld is specified by
How to find permissible diagonal tensile stress in reinforced brick work
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
it is a corrected question." make a list of engineering property(properties) of soil.
why & what is perchatage we are using fly ash in concrete?
how to control PQI (Project Quality Index)