Answer Posted / deoghar
Lap length is required for tie up with same bar for continuity of the role or steel.
Lap length : 50d
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to hide dimensions in autocad?
How much cement and sand required for 9"brick wall per square metre
what are the ffactors you considered choosing the course?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
What is the Unit weight of coarse sand (F.M- 2.20) ?????
for pretensioning which will yield first and same for post tensioning?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
Which tests are performed on soil to decide the type of foundation to be provided.
How much for the BRC lapping in full yield and half yield < and which table to get it ?
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
What is the significance of cost estimate knowledge for an architect?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
What is Critical path in Ms-Project ?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.