Answer Posted / sjtbehera
Lap length are recquired when distance of structure is
larger than the length of Bars.
It is recquire to bind the two bars so that load can
carried.
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
How to calculate volume of concrete & steel on tank foundation & ring wall ?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
how to do sudoko puzaals?
what are the five benefits of using standard terminology in the measurement process?
how much repeitation for conventional and maivan formwork?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
Does brick grows bigger every year?
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
Explain major differences between routing maintenance and major maintenance.
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
What does civil status mean?
Explain why concrete barriers have curved surface profiles?
what is Bearing Capacity,How to determine it?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?