08. 4 main points about check list for Shuttering works
are––– 4
i)
ii)
iii)
iv)
09. 4 main points about check list for Concreting works
are––– 4
i)
ii)
iii)
iv)
10. 4 main points about check list for Plaster works
are––– 4
i)
ii)
iii)
iv)
11. 4 main points about check list for Brick works are––
– 4
i)
ii)
iii)
iv)
12. 3 main points about Project delaying factors are–––
3
i)
ii)
iii)
13. Write down 60-grade M.S. deformed bar
specification. 3
14. 3000 psi concrete means:
1
15. 4 main points about methods of wastage control are––
– 4
i)
ii)
iii)
iv)
16. 1 main point about reasons for your honesty is :
1
17. Water cement mixing in hopper less mixture machine
is better than hopper mixture machine because: 1
18. 2 main points about your role during roof casting
are–––– 2
i)
ii)
19. a. The weight of 3333m deform bar of 24.5 mm dia
is…… 1
b. The weight of 300 rft plain bar of dia 1
is……. 1
20. The types of slumps are–––
3
i)
ii)
iii)
21. 4 main points about the causes of cylinder failure
are––– 2
i)
ii)
iii)
iv)
22. Detection of a beam & a girder are––––
2
i)
ii)
23. Curing is needed for––––
1
24. The types of slabs in respect of size & shape are–––
5
In respect of size: i)
ii)
In respect of Shape i)
ii)
iii)
25. The types of Column in respect of size & shape are––
– 9
In respect of size: i)
ii)
In respect of Shape: i)
ii)
iii)
iv)
v)
vi)
vii)
26. 3 field tests & 3 Laboratory tests of bricks are–––
6
Field tests: i)
ii)
iii)
Lab test: i)
ii)
iii)
27. 2 field tests & 1 Laboratory tests of sand are–––
3
Field tests: i)
ii)
Lab test: i)
28. 1 field tests & 1 Laboratory tests of M.S rod are–––
2
Field tests: i)
Lab test: i)
29. a. The % of water absorbs by brick chips: ……………
1
b. The % of water absorbs by Stone chips: ……………
1
30. In respect of design:
5
a. The % of strength gains by concrete in 28 days=
b. The % of strength gains by concrete in 14 days=
c. The % of strength gains by concrete in 07 days=
d. The % of strength gains by concrete in 03 days=
e. The % of strength gains by concrete in 28 days
without curing =
Answers were Sorted based on User's Feedback
Answer / guest
1. four main p;oints of checking list of shuttering
i. verticality
ii. support
iii.centerline of shutter
iv. cover from shuttering to main reinforcement
2.main points of checklist for concrete work
i. pouring
ii. vibrating
iii. slump
iv. water content
3. main points of plaster
i. mixing material
2. checking th. of plater
3. checking equalness
4. fine sand
4.for brickwork
i. testing brick strength
ii. fixing english bond method
iii. verticality
iv. as per drg.
5. project delaying factor
i. avialabe resource manpower
ii. resource of material
iii.project monitoring
6. 60 grade deformed bar specification
i. tensile strength-410/530 n/mm2
ii. yeild stress-265n/mm2
7.psi means
pound per square inch.
8. wastage control
i. preparing check list
ii. utilisation of cut pieace
iii. proper storing
9. honesty means saving your cost
10.less due to non wastage of water
11.role in roof casting
1. checking rod as per drg.
ii. proper vibratior of concrete
iii. mantain slope
iv checking shuttering and support
12.please calculate the length x unit weight of 24.5mm dia
bar
b. not understanding the question
13.types of slump
1. true, 2. collapse 3. zero. 4. shear
14.
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / shuvo.
Q.1 main point about reasons for your honesty is :
Ans. The faer of Creator.
Q.2 main points about your role during roof casting
are-i.Compacting of concrete by vibrator, ii. Slab Casting
level checking.
Q.Write down 60-grade M.S. deformed bar
specification.
Ans. Yeild strength- 60 KSI, Ultimate Strength- 90 KSI,
Elongation- 14%.
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / moin khan
1.Layout cutout size &level
(as per drw.)
2.Soupport fixing
3. Oiling shuttering board
4.ghoogu in beam higher dept
Is This Answer Correct ? | 0 Yes | 1 No |
For 1 cu m of concrete required 1.54 Cu m times dry volume. Pl give clarification of 1.54 factor
1 Answers RASA, Unity Infraprojects,
what is the multiplying factor for diffrent types of pcc/rcc ratios?
how do make a measuring box for 1 cubic metre of 1:2:4 concrete for 350kg
Defination of civil engineering
60-70 grade of Bitumen is VG-30 ?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
define the grain size analysis and what is the silt size?
Please any body describe me manpower used calculation for a building construction.
1 Answers Metro Constructions,
how many rods to be require in kg 10sq.m slab?
Kindly tell me a book name to study for BIS exam
what is civil enginnering & what you need of this course?
What will be the crank length in an staircase is same like an slab?