Answer Posted / om prakash narayan
Lap Length is 3/2 lap Lenths. Depends on Road
Length.Methods are 3/2. ItS Reqiured is very impotant
Reniforcement continous.
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
How can you produce desired alloys and discuss their applications in daily life.
how to identify the failure of building by expansive soils
What are the problems one might face while having a Cantilever balcony?
what is idealized curve for concrere and steel
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
What is diversion tunnel in a dam?
What difference comes in constructing of house and a housing complex like society
questions with answers to face an interview of an civil engineer regarding RCC buidings
from where ican get sample papers for CET-delhi 2012
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Sir how to find cutting length for footing steel bars in the shape of "u"
how much cost of single coat 20mm thick plastering per sqre meter
Which are the top apps for you civil engineering?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?