plz tell me the compresive stength of genral con. & foam con. all grade after 7,14,21,28 day
Answer / hemanta ku.das
Use this formula we calculated any days strength.
Sp-24,page no-20.
Is This Answer Correct ? | 2 Yes | 0 No |
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
Do you know differenence between design mix and nominal mix?
how much of the strength comes from post-production curing
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
how to prepare site mix design
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
number of standard bricks need 1 cubic meter
How can I calculate the Compressive strength of cubes after 28 days of curing?Is there any formula or ration ?
What is the rate of earthwork excavation?
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
mix design ratio of M30 concrete