Which is better ost or pst?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Sir i am doing my btech biotech at dy patil pune nd due to some prob i need to shift backbto surat so is it possible to transfer at bsc biotech college in surat
What according to you is the prime objective of the sap financial supply chain management?
What is the use of payroll control record?
What is java abstraction with example?
What is truncate table?
Is com surrogate a virus?
What is known as the translation factor?
When you are creating a table what is the default table group?
Explain about control objects?
How to make a class data class ?
why cost center is assign to gl account in sap
What happen on the namenode when a client tries to read a data file?
Who maintains the uml specification and how is it updated?