while grounding the galvenized metallic structures is it
necessary to remove the galvenization at the point of
contact? Or other wise is the galvenizatio a good conductor?
Answer / amrinder singh
yes it is necessary to remove galvanisation.
| Is This Answer Correct ? | 1 Yes | 2 No |
Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.
what is difference betwen genrator and alternator?
how to read idmt curva
two phases with neutral supply can be taken in 3C X 10 sq.mm cable .
Damping resistor provided in open delta (tartiary) winding of a measuring PT at the incoming of a MV inverter drive panel is getting heated up. Can any body explain the reasons and suggest the remedy?
what is arc flash and what are the hazards involved
what is the purpose of %impedance for transformer
can v rotate single phase induction motor in both the direction...?
Is it possible that Generator trip but Turbine not trip.Give explanation.
how can we calculate the current
what is positive,negative and zero sequence in power system?
What can a fresh(without experience) electrical engineer contribute to NTPC( Or any PSU company) growth?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)