What is meant by operating sequence of VCB : 0–0.3sec.–CO– 3min.-CO..

Answer / srinivasan.

open-300 millisec-Close /open-3min-Closeopen - means the
circuit breaker is capable of performing the above
operations even at full shorcuit currents.
At the same time the circuit breaker should not be allowed
to operate lesser than these timings.For example open-20
millisec-Close open-1 min-close/open.

This type of breakers are called single shot autoreclose
breakers.
Immediately after a fault breaking,we can do close open the
circuit breaker.

This sequence is tested during type testing only.

Is This Answer Correct ?    16 Yes 3 No

What is meant by operating sequence of VCB : 0–0.3sec.–CO– 3min.-CO..

Answer / k.prakashchandra

CO means closing followed by opening.

Is This Answer Correct ?    3 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

in railways why we use the power in 10,20 30kv,why not in the multiple of 11kv

2 Answers  


what is importance of ka in mccb

2 Answers   ABB,


can you any one give exact mathematical relation between AC current and DC current?

0 Answers  


please give me all the Alarm .Trip ,Safety Relays & Conditions of Diesel-generators mail me on ashokbabunhce@gmail.com

0 Answers  


Are generator action and motor action relates to a particular machine only?

2 Answers  






what are the effects when a salient pole alternator is run at high speed like 3000 r.p.m?

0 Answers  


Explain the process of commutation in a dc machine.

0 Answers  


what is the difference between between open delta and broken delta?

5 Answers   Reliance,


Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.

0 Answers  


america 60hz electric supply is used; but india it is 50hz; why? and if we use 60 hz supply what changeg has to be done or all the equipment has to be thrown which has rating of 50hz frequincy

1 Answers  


In 11KV Double pole structure for each phase we are using Disc one Insulator. Why we are not using 2 r above insulators instead of one insulator?

4 Answers   Genus,


What happened when we give 2 phase supply to a 1 phase equimpent. It's effect on equipment's efficiency and life?

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)