Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Tell me about the synchronization panel.



Tell me about the synchronization panel...

Answer / rahul dev

First Know the Synchronization.
We have to check 4 parameter in sequence listed below.
1. Phase Secquence.(this has to be 1 time.basicly this is
the rotation of the phase.)
2.Voltage has to be equal.(but in practical case votlage
difference not more than 2%)
3.Frequency has to be equal .(but in practical case
Frequency difference not more than 2%)
4.Phase angel difference must be zero(but in practical case
phase angel difference not more than 7*)
so we required in Synchronization Panel.
2 volt meter,2 frequency meter,Phase angel check Relay(CSQ)
in case you dont have the csq you can use the dark lamp
mathod.

Is This Answer Correct ?    7 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

what does a positioner in control valve ?

11 Answers  


what is the difference between 3,4 wire RTD sensor?

6 Answers   HTA Instrumentation,


What is sensitivity of K type thermocouple? Is polarity important in thermocouple connections?

3 Answers   Honeywell,


How does a strain gauge measure pressure?

2 Answers  


How will you change the action of a control valve?

1 Answers   CCIE,


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

0 Answers  


WHY TEMPERATURE TRANSMITTER USED AS WE CAN CONTROL THROUGH THERMOCOUPLE/RTD

5 Answers   Samsung, Thermax,


Explain the mechanism behind the turbine meter.

0 Answers  


if tx. dp increase or decrese what happend in the reading

1 Answers   BSP,


what is the difference between 2 wire and 3 wire RTD- application wise,cost effectivity?

2 Answers  


What different types of problems do occur while doing the loop checking? and please explain in detail or mail me at kadam.aniket143@gmail.com

1 Answers   Operational Energy Group, Process Control Technologies,


WHAT IS A CALLIBRATION? WHAT IS MEEAN BY LOOP CHECKING INCLUDES PRESURE, THERMOCOUPLE,TT,DT?

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)