Can anybody help me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates?
Regards,
Answers were Sorted based on User's Feedback
Answer / mirza mustafa baig
Dear Chatterjee sir,
kindly mail me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates.
plz for me too.
My Id is mustafa_00766@yahoo.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sreepad rao
Dear Chatterjee,
Kindly mail me the details,and formats for the Quality
checks for the same please.
my E-mail ID-raosreepad@gmail.com
i am waiting for the help.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / lavan
Dear chatterjee sir,
Kindly help me by sending me the formats for quality checks
of common building materials like
cement,concrete,bricks,sand and aggregates.
my email id is slavanya61@gmail.com
Thanks you sir
lavanya
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vikas kumar
Respected sir
Kindly same me on my mail plz
vikasrites@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sumit
Dear chatterjee sir,
Kindly help me by sending me the formats for quality checks
of common building materials like
cement,concrete,bricks,sand and aggregates.
my email id is be.sumit@yahoo.co.in
Thanks you sir
sumit
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sharad
Dear chatterjee sir,
Kindly help me by sending me the formats for quality checks
of common building materials like
cement,concrete,bricks,sand and aggregates.
my email id is to_sharad2007@rediffmail.com
Thanks you sir
sharad
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mallappa
Dear Chatterjee sir,
kindly mail me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates
my mail id is md.hukkeri@gmail.com
Thanks and regards
mallappa d h
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mustafa
my email id is mustafa_00766@yahoo.com.plz a favour for me?
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / govindaraj
Dear Chatterjee sir,
kindly mail me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates
My Id is kmgraj@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / deepak raj
Dear Chatterjee sir,
kindly send mail me by attaching that details files for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates
My Id is pdraj03@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
How many required steel of 1m3 slab casting?
How To do Steel Design of Beam,Columm,Slab,Staircase,Wall?
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
DEAR ALL I HAVE AN OPURTUNITY IN WORK IN AFGANISTAN? MY QUESTION IS WHAT IS THEPRESENT SAFETY POSITION IN AFGAN? HOW IS THE COMMUNICATION AND BANKING FACILITIES IN AFGAN? HOW IS THE CLIMATE ABOUT AFGAN? ANYBODY KNOW ABOUT THE ABOVE DETAIL PLS TO SENT THE ANSWER. IF YOU ARE INTRESTED TO SENT THE ANSWER PERSONALLY PLS TO CONTACT MY MAIL ALSO. @ santhoshselvamani@gmail.com
What are the different types of pile founations used?
What is Gabion Walls?
FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38
how much quantity of sand,cement,reqired for 100sqft of wall construction. And how much quantity required for plastring
1 Answers Jade Software, NSP, TCS,
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
why construction joint in the slab should be l/3 of span? what's the technical reason for that?
what is lap length?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)