how much quantity of sand,cement,reqired for 100sqft of wall construction.
And how much quantity required for plastring
Answer / ramadass
Required of cement : 33.48kg
required of sand :133.92kg
| Is This Answer Correct ? | 5 Yes | 5 No |
what is minimum reinforcement required for rcc works
is load combination is necessary in staad pro design
Which types of Water Proofing to Be used in Swimming Pool.
2 Answers CCEL, Ideal Construction,
why is the column design?
calculate the cost for AAC block wall of 15cum?
why you considers yourself suitable for the post of site engineer
5 Answers Consultancy, Nalco, Ritspin Synthetics,
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How to determine thee cut length for steel reinforcement bars in R.C.C design
What is CRMB ? And how it is beneficial to the service life of the road?
to construct 1450 rft length of 6 feet wall how much cement sand and blocks are required????
Kindly tell me how much extra steel bars are provided in a RCC roof and distance of bends in different sizes of roofs. Please also tell me that bars provided in chajja are taken seperate or main bars or short bars are extended in chajja. please send me the answer@ suhail_akhter@hotmail.com
why we do multiply 1.54 for dry volume of concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)