why construction joint in
the slab should be l/3 of
span? what's the technical
reason for that?
Answer / deepak katyal
Construction joints have been provided at 1/3 point of span
on the basis that moment is least there.
| Is This Answer Correct ? | 20 Yes | 2 No |
What is the ratio of cement ,sand, and aggregate to be used in M20 grade of concrete when excavating 200 x 200 x 200 mm of sand from soil
How to Calculate the amount of Cement mortor required only for 12 or 10 mm bonding? I mean to know only the amount of mortar for bonding not for plastering. Help me to find this.
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
What are the causes of building collapse?
How much depth of excavation have to do for Highrised builldings?if Raft foundation how much,and Pile foundation how much?
When brick size is 3x5x9" , what would be the number of Brick requirement for 100 sqft area of 5" width?
how quantity of much blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork
What is fineness modulus ? and its sieve # ?
design data for small rc square water tanks
how to calculate the amount of cement & sand required for plastering
Basic questions of civil engineering
0 Answers ONGC, RB Construction,
how you calculate the qty. of cement ,sand,aggregate from proportion 1:2:4 M15
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)