why construction joint in
the slab should be l/3 of
span? what's the technical
reason for that?
Answer / deepak katyal
Construction joints have been provided at 1/3 point of span
on the basis that moment is least there.
Is This Answer Correct ? | 20 Yes | 2 No |
IS code for grade of concrete for bamboo lintel????
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?
1.why can't we used sea sand in construction? 2.can we change sea sand into normal sand? if yes how?
whatare the load combinations which are used for the foundation design in a tall structure ( 10 storied building)?
What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building) area of RCC?
how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30
1 liter emulsion paint covered how much area?
17 Answers Asian Alliance Insurance, Aspirtek, DEWA, L&T,
how much steel required for 1 sq.m area?
what is workability,define it?
M30 Grade Concrete unit weight
What are new technologies in civil engr. that can reduce construction cost?