What should be the maximum allowable time for placing ready
mix concrete? The specification requires concrete placement
within 90 minutes of batching at the plant. What is the
significance of this 90 minutes & should this be used as a
rejection criterion? What effects does the concrete has
after that time period?
No Answer is Posted For this Question
Be the First to Post Answer
Is it possible 18" beam rest on 18" beam and created the junction on beam instead of column?
what r remedies taken for foundation in black cotton soils..??
What is the difference between M20 and M25 concrete?
What is rolling stock
If i buy some material and the seller asks me my TIN number what does that mean?? Is it my Taxpayers Identification number or it is my Tax invoice number? What does both of these stands for???
what will be the lap length of column reinforcement in case of welded lap
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
what is fe 415 steel
15 Answers L&T, Nabard, Rahul Computers,
what is lever arm constent formula?
Which code is used for tor & tmt steel bar?
what is the wait of cement in different concrete mixes from M15 TO M50
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)