Respected sir i am appearing for the exam this year.I will
be highly obliged if u kindly send me last year's interview
paper on civil engineering in my email address
debosmitroy@yahoo.in
Answer / sjtbehera
look debosmita no question paper are provided by the
company to takehome. is the objective type question &
answering is to given on question paper .
sorry
| Is This Answer Correct ? | 5 Yes | 1 No |
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
How many square meter can a worker/labor demolish a structure per day?
How much will be Concrete required for one Sq.meter of area for building work?
2 Answers PSD, SMC, Tudor Infrastructures,
What is the cement and sand content in the mortar used to build 1 sqm of 190x190x390mm hollow and solid blockworks?
Why steel rods are produced only in even dimensions?
whats the difference between young's modulus,stress and pressure.they have same unit
Is there any change in IS code regarding location of laps for column reinforcement. Can we place staggered alls for column reinfr.at one floor lvl?
why we need pcc?
if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench
explain kn/sqm in detail.
define silt?
what is the percentage of silt in black cotton soil.?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)