What is geopolymer based concrete?
No Answer is Posted For this Question
Be the First to Post Answer
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
What is the diffrence between plinth/basement and plot area
Define mirror?
Tell the least count of a prismatic compass , surveyor compass , Theodolite & how we can determine it ?
2 Answers UPPSC Uttar Pradesh Public Service Commission,
Which IS Codes used for the steel reinforcement work?
How calculate Load Bearing Capacity of Soil?
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
What are the structural steel & where they are used
the min diameter of steel used in footing are
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
what is high type road and low type roads
what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)