how to calculate the amount of cement & sand required for
plastering
No Answer is Posted For this Question
Be the First to Post Answer
what is penetration test?why it is done?
Why beam breadth smaller than depth
For M25 concrete ,what is the maximum compressive strength at 28 days ?
6 Answers L&T, Techno Builders,
What is a bearing capacity of soil?
What the codes used for Rigid Pavement and Flexible pavement.
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
What is the meaning and full form of FTA and MTA in plumbing material
how to calculate MR 9(derivation)
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
how you calculate the qty. of cement ,sand,aggregate from proportion 1:2:4 M15
How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance
what is stress
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)