Q1) I am having an interview in a construction company for
a large sewage project . Since I have not done any such
project , there are some queries from my end. Pls. help me
to solve them. I will be thankful to you :-

a) Normally for large project 400-600 houses & around
1600 peoples , how much dia pipe is used and which type of
pipe is used?
b) For trenching , I have heard that IS 1200 implies,
what are the rules of calculating earthwork in case of
depth of 2m or above ?
c) To prevent soil to fall when depth of trench is
more , what steps are taken and how there qty. is
calculated . Like I have heard about timbering . what is
this ?
d) What are the rules for disposing off the excavated
soil ?
e) How the pipes that are used are being jointed?
f) In case of cleaning on choks , is there any
intermediate things provided?
g) For foul gases any outlets are provided thru out
length of pipeline?
h) What is the flow digram like from houses thru small
pipe to main pipeline than where main pipeline disposes
wastage ?
i) Any other thing that has to be kept in mind while
calculating earth work for excavation like steps are made
and other things? How earthwork is calculated in case of
steps ? Pls. explain with a sketch.


Regards,



Q1) I am having an interview in a construction company for a large sewage project . Since I have..

Answer / sjtbehera

Ans1. +generally raw water from house to treatment plant CI
pipe are used. is maximum 600 Dia. in plant maximum 200 dia
re used. HDPE pipe are used.

ans - calculating earthwork is based on site condition.
although some rules are provided in IS 1200, but it is
better to calculate in site. below 2mm avg. calculation are
done

ans-for falling of earth scour are applied. this means some
protection done for sliding soil to the trench. it is aform
of net, tina fixing or sand bags are provided.

Ans- disposal of earth from site not follow some basic
rule. Calculate filling earth. volume of this earth are
store in suitable site. rest you disposal according site
incharge.

ans- pipes are joint in collar joints or welding

ans- choks are omitted by manual or by pressure

ans- no vent pipre are not provided in pipe. sweage dirctly
transfer to treatment plant. air ventilation pipe are
provided for air pressure.

ans- sorry this page are not allow to draw sketch

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

0 Answers  


how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.

2 Answers   Cube Construction,


What are the Types Of DPC and its Thickness used?

0 Answers  


Dear Sir , I have my diploma in civil engineering in distance mode, so can i do my B.teck in regular stream . kindly suggest Regards Ramakrishna

1 Answers   RK Surveyors,


curing of concrete why 7day's,14day's 21day's 28days

5 Answers   Gammon,






the size of one block is 390mm×190mm×190mm.then how much block will required for 4.6m × 3.4m wall.the thickness of wall is 190mm

1 Answers  


For what building Built-on balconies are preferable? What are the advantages?

0 Answers  


what is construction joint? why do we give expancion joint in building?

4 Answers   jusco, L&T,


how to calcalate for roof beams & slab reinforcement design specified?

1 Answers  


questions with answers to face an interview of an civil engineer regarding RCC buidings

0 Answers   Horizon Computers, NBCC,


What is rate of concrete surface rendering work per sqm

0 Answers  


I Have concrete mix with 440kg opc and having 37 mpa strengh in 7days while in 28 days only 42mpa can anybody tell me the reason for the same.

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)