how to carry out rate analysis for RCC work in column using M20 ?
Answer / rajasekar
cost of M20 concrete and concrete mixing labour.The labour part may change from place to place.If it is hand mix, we have to consider the lead and lift of material.Shuttering and steel not to consider in the concrete volume.
Is This Answer Correct ? | 2 Yes | 0 No |
Specific gravity of Cement? Water?
what should be the deduction for bend in stirrups while calculating cutting length? Is it 1 dia at each bend?
what is mean by stripping?
steel which is used for reinforcement and structures why they are directly used why GALVANISATION or PRIMER is not done to prevent from corrosion
What is soil enforcement?
Minimum and maximum size of the building components
HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm
why & what is perchatage we are using fly ash in concrete?
what is called camber in the road ?
How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
what are the types of bridges respective to the span ?