how to carry out rate analysis for RCC work in column using M20 ?
Answer / rajasekar
cost of M20 concrete and concrete mixing labour.The labour part may change from place to place.If it is hand mix, we have to consider the lead and lift of material.Shuttering and steel not to consider in the concrete volume.
| Is This Answer Correct ? | 2 Yes | 0 No |
what,s the clear cover of beam,slab,column,lintel and foundation?
36 Answers Max Myanmar, Spar Geo Infra, Yashwant Construction,
What is diversion tunnel in a dam?
What is the absolute pressure scale?
How to calculate the sand and aggregate in concrete
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
How to check slab shuttering level.? Or check list for slab ?
convert 1 guntha = how many wars or 1 war = how many gunthas
which type of binding wire gauge using gulf countries
Why do we provide development length in RCC?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
What is mean concrete class c35/20. Here C35 and 20 means?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)