contractor receive 100 MT steel.after compliting the work
the contractor refund 90 MT steel.How reconsilation of steel
done?
No Answer is Posted For this Question
Be the First to Post Answer
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
which is greater moment at centre or fixed end moment for a fixed beam with udl
what is the pile
1 Answers Chandra Group, GVR Constructions, Simplex,
how to replace 8mm bar with 10mm bar if the the 8mm bar is not available..???
what is civil enginnering & what you need of this course?
What is the force exerted by the tacoma narrows bridge?
How do you derive the quantity of cement & sand in brick work construction in 1Meter cube, using CM 1:6 and bricks of size 19*9*9 cm
what is local scouring?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
what is Bearing Capacity,How to determine it?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)