when does sedimentation occur
before filteration, along with it, along with chlorination,
after chlorination?
Answers were Sorted based on User's Feedback
Answer / praveen gupta
Sedimentation occurs before filtration.
and the process is
Screening - Areation - Sedimentation - Filtration -
Chlorination
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / suresh
sedimentation should be done before the filteration because
the voids in the filter bed may get clogged if the filteration is done before the sedimentation.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pooja
sedimentation occur before filteration and by chlorination,
rate of sedimentation increases.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sunil kumar
Sedimentation is a process the treat of water .it occur
before flocatation and then provided the filtration step.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / mks
flash mixer - sedimentation - filtration - chlotination -
vaporization
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rahul
In water filtration two type of sedimentation used
1. Plain sedimentation
2. Sedimentation aided with coagulation
| Is This Answer Correct ? | 0 Yes | 0 No |
How to calculate the Volume of PCC, Footing Base, Footing Column, Grouting, Base Plat and plinth beam
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
Which of the following states has become the first Indian state ( in August 2016) to distribute 2 crore LED bulbs under Ujala scheme of union government? A) Gujarat B) Madhya Pradesh C) West Bengal D) Maharashtra
How much does it cost for a R.C.C roof slab of size (25 X 20) given in feets using 1:2:4 concrete mix of M20?
what is stressing
how the take measurement at column and beam junction
what is the tool used at construction site for measuring cement, sand and blue metal in india.
how to do cementicious paint for rcc walls of cw pump house
I s code of steel
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
1 Answers JPMorgan Chase, Sobha Developers, Structwel,
can any give me bhel n other govt sec interview question
why +1 to be followed for calculating the no of bars in BBS. Please explain
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)