Answer / sumeet rathod
1.for 1 sq/m slab reqired = 2span @ .600c/c
2.for beam support vertical iron props are required always, 1st prop kept from column at a distance of .230 and than .600 c/c
| Is This Answer Correct ? | 8 Yes | 5 No |
List out the diameter of series of bar for beam, column, slab and footing?
10. Do you remain in good relationship with your previous employer / company where you no longer work /?
How to calculate the volume of sloped isolated footing?
How to calculate steel for beam slab and column
Theemergency provisions of the constitution of india were greatly influenced by: a)the government of india act,1935 b)the constitution of canada c)the weimer constitution of germany d)the constitution of the united states
How will you provide reinforcement from corrosion?
How can we compact the soil on slope portion? What is the Grade II of Stone Metal?What type tests carried out on BBM road?
sir i have 2700sq.ft area.i wish to make a coomercial space including this area.sir what could be the estimated cost of 3 story bulding in varanasi.
how much binding wire required per tonne slab beam columns
how much quantity of cement(bags)concrete(20mm)and sand(sqft)is used in 1:3:6 PCC
How many BRICKS required for 10 cumic of brickwork
in staad which are the point is to be checked for not fail of structure
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)