in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
2 Civil Engineering 10847For a RCC section with congested reinforcement , what is the compaction factor
2 Civil Engineering 7517
how much % of fine sand(jamuna sand)we can use with coase
sand for making concrete.
Answer
Is This Answer Correct ? | 10 Yes | 2 No |
What is meant by Anchorage length? Development Length?
Answer
Is This Answer Correct ? | 139 Yes | 93 No |
Question { 5703 }
Q1) I am having an interview in a construction company for
a large sewage project . Since I have not done any such
project , there are some queries from my end. Pls. help me
to solve them. I will be thankful to you :-
a) Normally for large project 400-600 houses & around
1600 peoples , how much dia pipe is used and which type of
pipe is used?
b) For trenching , I have heard that IS 1200 implies,
what are the rules of calculating earthwork in case of
depth of 2m or above ?
c) To prevent soil to fall when depth of trench is
more , what steps are taken and how there qty. is
calculated . Like I have heard about timbering . what is
this ?
d) What are the rules for disposing off the excavated
soil ?
e) How the pipes that are used are being jointed?
f) In case of cleaning on choks , is there any
intermediate things provided?
g) For foul gases any outlets are provided thru out
length of pipeline?
h) What is the flow digram like from houses thru small
pipe to main pipeline than where main pipeline disposes
wastage ?
i) Any other thing that has to be kept in mind while
calculating earth work for excavation like steps are made
and other things? How earthwork is calculated in case of
steps ? Pls. explain with a sketch.
Regards,
Answer
Is This Answer Correct ? | 2 Yes | 0 No |
Question { 4225 }
indiploma civil engineering student r studied is456-1978.
but in practicial we r using 2000 version
i think 1978 version didn't use the student.
any openion?
Answer
Is This Answer Correct ? | 7 Yes | 0 No |
Question { 2977 }
A floor has to be removed partially with block work tying
floors together, can block work continue on floor that has
to removed excluding demolishing works tying floor from
underside of slab and top of slab demolishing floor upon
completion?
Answer
Is This Answer Correct ? | 0 Yes | 0 No |
Question { 6764 }
1. if only 1 slab of a floor get sagged, how could be it
repaired?
2. if any footing gives the cube result, after 28 days less
than 16 n/mm2 in spite of 20 n/mm2 what are the remedies ?
Answer
Is This Answer Correct ? | 2 Yes | 7 No |
RCC colums of 15"X9" each, roof height 10.5'ft, total
pillars 12 nons. Span between pillar to pillar is 14/20/20
length wise and 17/14 width wise. Total Slab area 2400 sft
and plinth area is 1900 sft. beams are 12"X12". kindly
calculate load factor per sqft.
Answer
Is This Answer Correct ? | 32 Yes | 4 No |
What is the diffence between prescribed mix and design mix
Answer
Is This Answer Correct ? | 39 Yes | 7 No |
Question { 9100 }
Difference between the setting time and hardenin time of
concrete
Answer
Is This Answer Correct ? | 5 Yes | 10 No |
Question { 14615 }
Define slump in terms of slump test
Answer
Is This Answer Correct ? | 6 Yes | 4 No |
Question { 11471 }
What are the types of test used to determine soil bearing
capacity
Answer
Is This Answer Correct ? | 25 Yes | 4 No |
What is Bearing Capacity of Soil? How will you calculate
for a particular type of Soil?
Answer