Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why we used bricks in brickbat coba? main roll of bricks ?
how it function?

Answers were Sorted based on User's Feedback



why we used bricks in brickbat coba? main roll of bricks ? how it function?..

Answer / chouhan ameen

We use used bricks because most of the voids in the bricks
get filled in its first use and hence they dont absorb much
water the second time.

Is This Answer Correct ?    12 Yes 7 No

why we used bricks in brickbat coba? main roll of bricks ? how it function?..

Answer / suresh

brickbat is mostly uesd in coba floring becouse brick bat
observar miosture and keep surface clean and dry

Is This Answer Correct ?    10 Yes 13 No

why we used bricks in brickbat coba? main roll of bricks ? how it function?..

Answer / saif raza

Reasons
1# brick is easily available material.
2# it absorve water & keep the surface clean
Main role
to raise the floor at required level & provide the
strength.

Is This Answer Correct ?    1 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg

2 Answers  


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

0 Answers   MES,


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

0 Answers   Power Plant,


Please any body describe me manpower used calculation for a building construction.

1 Answers   Metro Constructions,


How to get cinema chance?

78 Answers  


How to calculate stirrups cutting length in columns

2 Answers   Construction,


what is kribs is supporting?

0 Answers  


What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...

0 Answers   SIPL,


what should be the quantity of water in m20 cocnrete /per bag cement-- whats the formula

3 Answers  


I am called for interview from north east power plant .so, I need some interview question which may help me.

0 Answers   Power Plant,


How will you provide reinforcement from corrosion?

2 Answers  


what is bolt value?

2 Answers   L&T, REC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)