bridge design




Answers were Sorted based on User's Feedback



Answer / rasmi k.r

bridge design..first we have to make the general layout of
a span of a bridge.then cross beams and longitudinal beams
are placed at suitable spacing and their size is also
assumed.
steps
1.calculate clear span and dead loads like due to slab and
wearing coat
2.calculate bending moments.
3.using pigeadus curve calculate moments
4.load dispersion due to wheel of train is calculated.
class A or class AA is used.now a daya class A IS commonly
used.
5.live load moments calculated.
6.check for shear is also done

Is This Answer Correct ?    11 Yes 0 No

Answer / nsk

First we study about the location, catchment area and
preliminay survey after that if necessay to provide the
bridge. we go to soil investigation and study the report,
afterthat design.

Is This Answer Correct ?    8 Yes 0 No

Answer / raja rammohan nayak

1-First we tapographical survey of this
area where the structure will be
construct.
2-Next prepare a drawing of the bridge
& also calculated design , estimate
the total cost of bridge.Calculated
the loads I.e.dead load , wind load ,
impact load , etc..
3-Then we can construct a bridge..

Is This Answer Correct ?    0 Yes 1 No




Answer / mouli

1. WE STUDY TOPOGRAFICAL SURVEY AND GEOLOGICAL SURVEY TO
FOUND HOW MUCH SCORING CALUCULAT ,YEALED BORE TEST FOR
FOUNDTIONS WHICH TYPE SUTABLE AND AS FOR CLASS LOADS
DIPENDING UP ON NO OF LANES AND CLASS OF ROADS AND WE GO TO
DESIGEN CALUCULATIONS OF MOMEN BY USE pigeadus curve
calculate moments

Is This Answer Correct ?    0 Yes 3 No

Post New Answer



More Civil Engineering Interview Questions

Why use of fly ash in cement

4 Answers  


What is softsoil? what kind of foundation?

10 Answers   BSR,


Diversion of cum to cft

9 Answers  


what is mean by bleeding of concrete

4 Answers   Afcons, Habib Group,


Trapezoidal section footing calculation of Volume & its Area

8 Answers   MCC, Real Value,






How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

0 Answers  


what is the minimum cement content for M20 & M25 as per is code -456(2000).

0 Answers   PBL,


Why we do design mix of concrete when there is nominal method using the IS-Code available ?

14 Answers   Engineers India Limited,


what are the major benefit in auto level?

1 Answers  


Column is a compression member then why we provide reinforcement on column?

1 Answers   Simplex, Thermax, Vihaan Group,


define formwork

1 Answers  


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

0 Answers   GVR, Howe Engineering, L&T,






Categories
  • Civil Engineering Interview Questions Civil Engineering (4622)
  • Mechanical Engineering Interview Questions Mechanical Engineering (3695)
  • Electrical Engineering Interview Questions Electrical Engineering (15736)
  • Electronics Communications Interview Questions Electronics Communications (2633)
  • Chemical Engineering Interview Questions Chemical Engineering (761)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (79)
  • Bio Engineering Interview Questions Bio Engineering (30)
  • Metallurgy Interview Questions Metallurgy (95)
  • Industrial Engineering Interview Questions Industrial Engineering (199)
  • Instrumentation Interview Questions Instrumentation (2868)
  • Automobile Engineering Interview Questions Automobile Engineering (171)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (41)
  • Marine Engineering Interview Questions Marine Engineering (60)
  • Power Plant Engineering Interview Questions Power Plant Engineering (168)
  • Engineering AllOther Interview Questions Engineering AllOther (1331)