bridge design




Answers were Sorted based on User's Feedback



bridge design ..

Answer / rasmi k.r

bridge design..first we have to make the general layout of
a span of a bridge.then cross beams and longitudinal beams
are placed at suitable spacing and their size is also
assumed.
steps
1.calculate clear span and dead loads like due to slab and
wearing coat
2.calculate bending moments.
3.using pigeadus curve calculate moments
4.load dispersion due to wheel of train is calculated.
class A or class AA is used.now a daya class A IS commonly
used.
5.live load moments calculated.
6.check for shear is also done

Is This Answer Correct ?    11 Yes 0 No

bridge design ..

Answer / nsk

First we study about the location, catchment area and
preliminay survey after that if necessay to provide the
bridge. we go to soil investigation and study the report,
afterthat design.

Is This Answer Correct ?    8 Yes 0 No

bridge design ..

Answer / raja rammohan nayak

1-First we tapographical survey of this
area where the structure will be
construct.
2-Next prepare a drawing of the bridge
& also calculated design , estimate
the total cost of bridge.Calculated
the loads I.e.dead load , wind load ,
impact load , etc..
3-Then we can construct a bridge..

Is This Answer Correct ?    0 Yes 1 No




bridge design ..

Answer / mouli

1. WE STUDY TOPOGRAFICAL SURVEY AND GEOLOGICAL SURVEY TO
FOUND HOW MUCH SCORING CALUCULAT ,YEALED BORE TEST FOR
FOUNDTIONS WHICH TYPE SUTABLE AND AS FOR CLASS LOADS
DIPENDING UP ON NO OF LANES AND CLASS OF ROADS AND WE GO TO
DESIGEN CALUCULATIONS OF MOMEN BY USE pigeadus curve
calculate moments

Is This Answer Correct ?    0 Yes 3 No

Post New Answer



More Civil Engineering Interview Questions

what are the strenth of 1cum brick work

5 Answers  


what is bitumen emultion where it is use

1 Answers  


is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.

1 Answers  


how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t

2 Answers   L&T,


what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

0 Answers   APPSC,






What is the ratio of cement,sand,aggregate of mix m25

9 Answers  


What is Rodding in Chimney construction?

1 Answers   SSC,


How do you derive the quantity of cement & sand in brick work construction in 1Meter cube, using CM 1:6 and bricks of size 19*9*9 cm

5 Answers  


what is features of a typ-ical modern air-conditioning installation?

0 Answers  


What is The meaning Of Auto cad And Also Define What Is Drawing According To You

14 Answers   MNC,


what will be the grade of concrete for PCC having ratio 1:4:8?

8 Answers   L&T, UIPL,


How to calculate Brick for 9"wall for100sqft

3 Answers   GPC,






Categories
  • Civil Engineering Interview Questions Civil Engineering (4637)
  • Mechanical Engineering Interview Questions Mechanical Engineering (3700)
  • Electrical Engineering Interview Questions Electrical Engineering (15765)
  • Electronics Communications Interview Questions Electronics Communications (2636)
  • Chemical Engineering Interview Questions Chemical Engineering (762)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (79)
  • Bio Engineering Interview Questions Bio Engineering (30)
  • Metallurgy Interview Questions Metallurgy (95)
  • Industrial Engineering Interview Questions Industrial Engineering (199)
  • Instrumentation Interview Questions Instrumentation (2879)
  • Automobile Engineering Interview Questions Automobile Engineering (171)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (41)
  • Marine Engineering Interview Questions Marine Engineering (62)
  • Power Plant Engineering Interview Questions Power Plant Engineering (170)
  • Engineering AllOther Interview Questions Engineering AllOther (1334)