i have applied for the post of RRB section engineering chennai
board please send me previou papers and solved answer.
my mail id jagarapusrinivas@gmail.com
Answer / Madhavanand
Unfortunately, I am unable to send you previous RRB (Railway Recruitment Board) papers or solved answers. You can download them directly from the official RRB website (<https://rrbcdg.gov.in/>). Your email address has been recorded for reference.
| Is This Answer Correct ? | 0 Yes | 0 No |
i want to know how to calculate the battery capacity based on the UPS . ex i want to run have one kva UPS Which should run 10 hours ? in that case how many batteries to be installed and what will be the AH Value .
How to test REF relay testing for LV panel as per Kahramaa standard?
What is given by the definition in BIL IMP/PF = 950/395 kV. This was found in a name plate of a power transformer.
I have 320 Kva DG Set his KWh running is 77 , how i can calculate into electrical unit .
2 Answers Anuj Enterprises, Schneider,
What is current & voltage ? Voltage perform at any load without current or not?
What do you mean by turns ratio of instrument transformer?
What is DC power factor??
11 kv input, 66 kv input advantages
How Calculat the Cable Sizing of HT/LT System & Explian by one Exampal?
Why Auto Transformer is called "Auto"? What is the logic?
how power factor improves by connecting syncronous motor
why voltage is low at reciving end in summer??
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)