Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How many earthings are required for commissioning the
Transformer?

Answers were Sorted based on User's Feedback



How many earthings are required for commissioning the Transformer?..

Answer / ganesan.n

Generally three earthings will be provided near the
transformer, they are namely:
1. Earthing for Lightining
arrester located at the pole structure,
2. Neutral Earthing,
3. Body Earthing

Is This Answer Correct ?    53 Yes 9 No

How many earthings are required for commissioning the Transformer?..

Answer / s naidu

Hear asking required for commissing the transformer
1-body earthing- 2nos
2-Neutral earthing-2nos
3-Lighting Arester for transformer protection
LA earthing-3 nos

Is This Answer Correct ?    20 Yes 2 No

How many earthings are required for commissioning the Transformer?..

Answer / somesh saran

1. 02 nos. body earthing
2. 02 nos. neutral earthing

Is This Answer Correct ?    9 Yes 0 No

How many earthings are required for commissioning the Transformer?..

Answer / easa paul

4 nos.(2 are for Body earthing and another 2 are for neutral earthing).

Is This Answer Correct ?    9 Yes 1 No

How many earthings are required for commissioning the Transformer?..

Answer / nazeer

one is neutral earthing and minimum two earthing for body
but if earth resistance is not below 2ohm additional
earthing has to be provide and make all link with each other

Is This Answer Correct ?    8 Yes 0 No

How many earthings are required for commissioning the Transformer?..

Answer / manoj kumar

total no of earthing is 5
where
lightining earthing
2 nos of boby earthing and neutral earthing

Is This Answer Correct ?    5 Yes 2 No

How many earthings are required for commissioning the Transformer?..

Answer / soma sekhar

1 Body earthing
2 Neutral earthing
3 Equipment earthing

Is This Answer Correct ?    5 Yes 2 No

How many earthings are required for commissioning the Transformer?..

Answer / prashant

there will be

body earthing - 2 nos

neutral earthing - 1 no

Is This Answer Correct ?    8 Yes 7 No

How many earthings are required for commissioning the Transformer?..

Answer / harnish desai

tehere are 3 nos. of earthing requres for comissioning of
x'mer.
1) body earth
2) neutraal earth &
3) lighting arrester earth.

Is This Answer Correct ?    2 Yes 1 No

How many earthings are required for commissioning the Transformer?..

Answer / mani0786

litening earting & must double body earting as rule IS 1956

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

What is static frequency control used in gas turbines

1 Answers  


What are the different types of trap used for Indian & western Toilets?

2 Answers  


what is the difference between gas group b and gas group c electrical equipment construction wise?

0 Answers  


Why do we use series motor to start our car?

2 Answers  


how much insultion resistance 11kv cable.

3 Answers  


differance b|w ground, neutral&earth

11 Answers   Bhel, SKH Metals,


Why an ac solenoid valve attract the plunger even though we interchanges the terminal? Will the poles changes?

0 Answers  


In DC current-excitation to transformer, why it sucks more current? Eventhough there is no power transfer between primary and secondary? R is very low so it should suck less current only na thn y its current increases?

2 Answers   Cairn,


To determine the Healthiness of Insulation we will be performing Dielectric tests i.e Insulation Resistance test, Partial Discharge test,Switching Impulse, Lightning impulse, Tan Delta test ...etc why we required to perform this many test, why cant we do only one test. for Transformer, CT's

1 Answers  


How to Make relay co ordination chart for a Electrical power distribution of a plant

0 Answers  


HOW MANY EARTHINGS REQUIRED FOR GENERATER

10 Answers   Juniper Networks,


Tell me about ur past electrical maintanence job

0 Answers   Apollo Power, Solar,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)