how we can calculate which capacity capacitor bank we have
to add for improve pf?
Answers were Sorted based on User's Feedback
Answer / abdulsubur
p total connect load in kw =932
cos 1 =power factor before improvement =0.8 assume
cos 2= poer factor after improvement =0.9
kvar 1= ptan1 932*0.75=699.03kvar
kvar 2=ptan2 932*.4843=451.39kvar
req rating of capacitor bank =kvar1-kvar2
=699.03-451.39
=247.64kvar =250kvar
| Is This Answer Correct ? | 12 Yes | 4 No |
Answer / z_hosen
More simply,
Let total power is 1500kw
assume
cos 1 =power factor before improvement =0.75
cos 2= poer factor after improvement =0.98
tan1=0.88
tan2=0.2
and
kvar 1= power*tan1=1500*0.88=1320kvar
kvar 2=power*tan2=1500*0.2=300kvar
now, required rating of capacitor bank =kvar1-kvar2
=1320-300
=1020kvar =1000kvar
thanking u
z_hosen@yahoo.com
| Is This Answer Correct ? | 11 Yes | 4 No |
Answer / karuppiah
Let total power is 1500kw
assume
cos Q1 =power factor before improvement =0.75
cos Q2= poer factor after improvement =0.98
tan1=0.88{cos Q1=0.75,Cos-0.75=46.01degree,Now angle is
46.01,so tan(46.01)=0.88}
tan2=0.2
and
kvar 1= power*tan1=1500*0.88=1320kvar
kvar 2=power*tan2=1500*0.2=300kvar
now, required rating of capacitor bank =kvar1-kvar2
=1320-300
=1020kvar
Capacitor Bank should connect parallel with the load.
Thanks
Karups
| Is This Answer Correct ? | 2 Yes | 1 No |
Is there possible to Test Transformer for Overfluxing Capability. Or is there any firm who does Overfluxing Test on Transformer?
How many turns are there in primary winding? (In Transformer)
What is called grain-oriented laminations?
What is phase cross over frequency?
Why we use auxillary relay ? what is function of differential relay, directional o/c relay?
0 Answers Century Rayon, Mechanical,
How earth fault & earth leakage equvpment are works?
bsnl tta exam question
pls send me some of the solved question booklet of Junior Engineer -2 (ELE) in RRB
why ct ,cvt should be stored in a vertical position?
What is the previous name of Cox's Bazar
sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)