what is general scouring?
Answers were Sorted based on User's Feedback
Answer / naresh
scouring is a process in which soft soil remove from near
the piers, due to the high stream flow.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / moula
removing of softsoil on stream or any water place due to
high velocity of water
| Is This Answer Correct ? | 4 Yes | 0 No |
Scouring can be defined as a process due to which the particles of the soil or rock around the periphery of the abutment or pier of the highway bridge spanning over a water body, gets eroded and removed over a certain depth called scour depth. Scouring usually occurs when the velocity of the flowing water increases or crosses the limiting value that the soil particles can easily handle.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / royal civilians
its the act of water to clean the surface.....this
scouring improve the softness of soil...i.e
river .......i have studied it in applied geology.....
| Is This Answer Correct ? | 2 Yes | 1 No |
removal of sediments such as sand and rocks around bridge abutement or piers
| Is This Answer Correct ? | 0 Yes | 0 No |
What is the difference between Backfilling & Refilling in Earth Work Group Item ?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Previous IS steel code?Thanks.
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6
what is the defination of an ideal fluid?
what is the formula for calculating concrete in circular column ? pls explain with diagram add a link for diagram
How to calculate numbers of carpenter, fitter, mason, unskilled worker on the basis of built up area or floor plat area of building?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
HOW YOU CAN DETERMINE THE WEIGHT PER METER OF STEEL RODS EASILY?
what is the formula of concrete quantity
4 Answers NKB, Soma Enterprises,
how many AAC blocks of size 600*200*225 mm are required for 1 cu.m of area
when we workout quantities of reinforcement steel , whate are the critari of lap length for column
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)