Answer Posted / gowtham1993
removal of sediments such as sand and rocks around bridge abutement or piers
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
explain fie benefits of using standard terminology in the measurement process
Water filter calculation formula
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
Which is the direction for positive angle?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
Explain what is progress payment?
What is the sugested procedure of water purification for public supply?
what are RIB slabs explain about it
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
How do we calculate absolute pressure?
What are the important hardware systems used for cad?
What is Curtailing of R/F