In foundation design, while we do the base pressure check,
we normally check if the attained pressure value is less
than the GROSS BEARING CAPACITY of the soil which is the
sum of net bearing capacity of soil and the overburden
pressure. Actually, the overburden pressure acts against
the net bearing capacity of the soil and I feel that we are
actually increasing the bearing capacity value and doing
the check. I feel that this is NOT right. Please clarify on
this.
No Answer is Posted For this Question
Be the First to Post Answer
Allowable wastage for ready mix concrete?
can anybody suggest me or rather send me tutorial of staad pro..iam in real need..thanks..id is:-ankit99991@gmail.com.
Why alternate bars are given bent-up in slab and how to decide the length of bent up?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
what is mean by tie beam?where it is used?
WHAT IS THE MINIMUM WATER CONTENT PER ONE BAG CEMENT FOR M20 CONCRETE
What us meant by DLP & liquidated damages in civil quantity surveying
IS code for Rolling Margin of steel
What is vertical dpc and where it is construct?
1 Answers Kanwarji Construction,
In site how we can identify one way slab and two way slab?
11 Answers Parth Constructions,
Soil will be infertile , When PH value of water will be A] 11 B] 10 C] 9.5
how can calculate qty of steel required for one or two ways slabs..
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)