In foundation design, while we do the base pressure check,
we normally check if the attained pressure value is less
than the GROSS BEARING CAPACITY of the soil which is the
sum of net bearing capacity of soil and the overburden
pressure. Actually, the overburden pressure acts against
the net bearing capacity of the soil and I feel that we are
actually increasing the bearing capacity value and doing
the check. I feel that this is NOT right. Please clarify on
this.
No Answer is Posted For this Question
Be the First to Post Answer
what is weight ratio for concerete grades M5 to M40
what is zero slump concrete
In Rcc work what ratio we need?
the capacity of a storage resevoir can be decided by using
What is IS code stirrups
hi... how to find reaction in continous beam 4 different span ?
Give me an example of a time when something you tried to accomplish and failed.
what are the forces acting on gantry girder
Hi is it any equation or relationship that describe the stress-strain diagram in concrete deep beam?
what could be the production cost of 1 cum of concrete by CP30 plant
Define Finite element method (FEM)
Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)