What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / gopi

back Filling:
after completing foundation or any structure,doing that gape filling or extra area
Refilling:
temporary or wrong excavation filled all excavated area

Is This Answer Correct ?    4 Yes 5 No

What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / sjtbehera

Backfilling is done after a structure complete its ground construction. Refilling means cutting then immediate filling but you go without technical both are same meaning.

Is This Answer Correct ?    2 Yes 5 No

What is the difference between Backfilling & Refilling in Earth Work Group Item ?..

Answer / sha

The excavated sand filling called back filling..and filling
red earth from out side is called refilling

Is This Answer Correct ?    2 Yes 9 No

Post New Answer

More Civil Engineering Interview Questions

Moisture content calculation for diff mix ratio's ??

0 Answers  


What is the difference between simply supported beams and cantilever beams

2 Answers   Osmani Constructions,


What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code

0 Answers   Private,


Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet

0 Answers   Jain Associates,


what will be the quantity of matterial and water for pcc in 1 cubic meter , the ratio is 1:4:8 (cement:sand:aggr) ?

3 Answers  






how to convert kg/m3 to cu ft

1 Answers   Ace Group,


How to calculate the sand and aggregate in concrete

1 Answers   DLF, OMC,


What is design life of a bridge?

3 Answers  


What is Fly Ash & Admixture & What is the purpose of mixing Fly Ash & Admixture to Design Mix? Tell the name of commonly used Admixtures

2 Answers   LCC,


why grading of cement is like 33,43,53?why not 25,35,45?

1 Answers   Gokaraju Rangaraju Institute of Engineering and Technology GRIET,


 rcc floor to floor  4m. in column reinforcement where we provide lap in exact location.     

0 Answers   Jain Group,


what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)